Rosseti of Centre, BO-05 (FIGI BBG00DQ060V1, 4B02-05-10214-A, МРСКЦенБО5, RU000A0JWR44)
Obbligazioni
Filtra i bond in base a +50 criteri (rating, rendimento, prezzo, ecc.)
Ottieni l'accessoObbligazioni
Tutto quello di cui hai bisogno per la ricerca e il monitoraggio del reddito fisso
|
«Interregional Distribution Grid Company of Centre», Joint-Stock Company, was established on December 17, 2004. The structure of IDGC of Centre includes the following branches: Belgorodenergo, Bryanskenergo, Voronezhenergo, Kurskenergo, Kostromaenergo, Lipetskenergo, Tverenergo, Smolenskenergo, Orelenergo, Tambovenergo, and Yarenergo. ...
«Interregional Distribution Grid Company of Centre», Joint-Stock Company, was established on December 17, 2004. The structure of IDGC of Centre includes the following branches: Belgorodenergo, Bryanskenergo, Voronezhenergo, Kurskenergo, Kostromaenergo, Lipetskenergo, Tverenergo, Smolenskenergo, Orelenergo, Tambovenergo, and Yarenergo. Industrial potential of IDGC of Centre is 2,308 substations of 35-110 kv voltage with the total capacity of 30, 366.3 MVA and 85, 097 substations of 6-10 kv voltage with the total capacity exceeding 14,227 MVA. |
|
|
|
|
|
|
| Following Business Day |
|
|
| 2026 | |
| 2025 | |
| 2024 | |
| 2023 | |
| 2022 | |
| 2021 | |
| 2020 | |
| 2019 | |
| 2018 | |
| 2017 | |
| 2016 | |
| 2015 | |
| 2014 | |
| 2013 | |
| 2012 | |
| 2011 | |
| 2010 | |
| 2026 | |
| 2025 | |
| 2024 | |
| 2023 | |
| 2022 | |
| 2021 | |
| 2020 | |
| 2019 | |
| 2018 | |
| 2017 | |
| 2016 | |
| 2015 | |
| 2014 | |
| 2013 | |
| 2012 | |
| 2011 | |
| 2010 | |
| 2009 | |
| 2008 | |
| 2025 | |
| 2024 | |
| 2023 | |
| 2022 | |